Country | People’s Republic of Bangladesh |
---|---|
Type | Nielsen lohse arch bridge |
Bridge Length(m) | 150m (Main span) |
Width(m) | 26.4m |
Steel Weight (m.t.) | 2,700t |
Completed | 2022 |
Country | The Republic of South Sudan |
---|---|
Type | 5-span continuous plate girder + 4-langer +2-span continuous plate girder |
Bridge Length(m) | 560m (150+350+60m) |
Width(m) | 12.9m |
Steel Weight (m.t.) | 2,489t |
Completed | 2021 |
Country | Republic of Uzbekistan |
---|---|
Type | Deck truss bridge + plate girder bridge (Total 5 bridges) |
Bridge Length(m) | 172m ~ 293m |
Width(m) | 8m |
Steel Weight (m.t.) | 5,036t |
Completed | 2012 |
Country | United Republic of Tanzania |
---|---|
Type | Simple span composite slab bridge |
Bridge Length(m) | 40m |
Width(m) | 30.4m |
Steel Weight (m.t.) | 463t |
Completed | 2022 |
Country | Socialist Republic of Viet Nam |
---|---|
Type | Through truss + plate girder bridge (Total 7 bridges) |
Bridge Length(m) | 51m ~ 176m |
Width(m) | 4.8m, 2m |
Steel Weight (m.t.) | 1,056t |
Completed | 2015 |
Country | Socialist Republic of Viet Nam |
---|---|
Type | Through truss bridge + plate girder bridge (Total 10 bridges) |
Bridge Length(m) | 81.1m ~ 305.7m |
Width(m) | 4.8m, 2m |
Steel Weight (m.t.) | 2,622t |
Completed | 2012 |
Country | Republic of Indonesia |
---|---|
Type | 4-span & 2-span continuous box girder bridge, Simple box girder bridge |
Bridge Length(m) | 253.3m, 105m, 55m, 55m |
Width(m) | 9.5m |
Steel Weight (m.t.) | 1,925t |
Completed | 2013 |
Country | Republic of Indonesia |
---|---|
Type | 3- simple span box girder bridge |
Bridge Length(m) | 102m |
Width(m) | 19.6m |
Steel Weight (m.t.) | 572t |
Completed | 2007 |
Country | Socialist Republic of Viet Nam |
---|---|
Type | Cable stayed bridge (Steel and concrete composite bridge) |
Bridge Length(m) | 230m + 550m +230m (Span) |
Width(m) | 10.75m X 2 |
Steel Weight (m.t.) | 2,700t |
Completed | 2011 |
Country | Republic of Korea |
---|---|
Type | Suspension bridge |
Bridge Length(m) | 300m + 1,150m + 350m |
Width(m) | 25.6m |
Steel Weight (m.t.) | 11,200t |
Completed | 2015 |
Country | Kingdom of Cambodia |
---|---|
Type | 3-span continuous box girder bridge |
Bridge Length(m) | 541m |
Width(m) | 13.5m |
Steel Weight (m.t.) | (Rehabilitation) Re-painting |
Completed | 2018 |
Country | Philippines |
---|---|
Type | 3-span continuous truss,3-span continuous plate,girder & simple beam |
Bridge Length(m) | 860.0 |
Width(m) | 12.7 |
Steel Weight (m.t.) | 2,100 |
Completed | 1970 |